{"id":169281,"date":"2025-12-22T15:27:36","date_gmt":"2025-12-22T12:27:36","guid":{"rendered":"https:\/\/pozirk.online\/en\/news\/169281\/"},"modified":"2026-03-09T20:10:49","modified_gmt":"2026-03-09T20:10:49","slug":"belarus-plans-to-connect-third-nuclear-plant-unit-to-grid-in-2035-38","status":"publish","type":"articles","link":"https:\/\/pozirk.online\/en\/news\/169281\/","title":{"rendered":"Belarus plans to connect third nuclear plant unit to grid in 2035-38"},"content":{"rendered":"\n<p><strong>December 22,<\/strong><strong>&nbsp;<em>Pozirk<\/em><em>.<\/em> <\/strong>Belarus plans to build a third unit at the nuclear power plant in Astraviec and connect it to the greed between 2035 and 2038, Energy Minister Dzianis Maroz said on December 22.<\/p>\n\n\n\n<p>He pointed out that it will be the same 1,200 MW unit as the two already operating ones, reported the press office of the House of Representatives, the lower house of the National Assembly.<\/p>\n\n\n\n<p>The ministry is in talks with Russia\u2019s Rosatom on terms and conditions of the project.<\/p>\n\n\n\n<p>Meanwhile, agencies are conducting studies for possible construction of a second nuclear power plant in the Mahilou region.<\/p>\n\n\n\n<p>Rosatom commissioned the plant in Astraviec, Hrodna region, in the fall of 2023. Unit 1 has supplied electricity to the grid since November 2020, and Unit 2 since May 2023. The units began commercial operation in June 2021 and November 2023, respectively.<\/p>\n\n\n\n<p>Rosatom commissioned the plant in Astraviec, Hrodna region, in the fall of 2023. Unit 1 has supplied electricity to the grid since November 2020, and Unit 2 since May 2023. The units began commercial operation in June 2021 and November 2023, respectively.<\/p>\n\n\n\n<p><a href=\"https:\/\/pozirk.online\/ru\/news\/164145\/\">Belarus to build Unit 3 at nuclear power plant in Astraviec<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>December 22,&nbsp;Pozirk. Belarus plans to build a third unit at the nuclear power plant in Astraviec and connect it to the greed between 2035 and 2038, Energy Minister Dzianis Maroz said on December 22. He pointed out that it will be the same 1,200 MW unit as the two already operating ones, reported the press [&hellip;]<\/p>\n","protected":false},"author":83,"featured_media":63993,"template":"","rubric":[17],"class_list":["post-169281","articles","type-articles","status-publish","has-post-thumbnail","hentry","rubric-economy"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Belarus plans to connect third nuclear plant unit to grid in 2035-38 | Pozirk<\/title>\n<meta name=\"description\" content=\"December 22,&nbsp;Pozirk. Belarus plans to build a third unit at the nuclear power plant in Astraviec and connect it to the greed between 2035 and 2038,\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pozirk.online\/en\/news\/169281\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Belarus plans to connect third nuclear plant unit to grid in 2035-38 | Pozirk\" \/>\n<meta property=\"og:description\" content=\"December 22,&nbsp;Pozirk. Belarus plans to build a third unit at the nuclear power plant in Astraviec and connect it to the greed between 2035 and 2038,\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pozirk.online\/en\/news\/169281\/\" \/>\n<meta property=\"og:site_name\" content=\"Pozirk\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pozirkonline\/\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-09T20:10:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pozirk.online\/wp-content\/uploads\/2024\/01\/pozirk_color_blank_1128x752.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1128\" \/>\n\t<meta property=\"og:image:height\" content=\"752\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@Pozirk_online\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\/\/pozirk.online\/en\/news\/169281\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/pozirk.online\/en\/news\/169281\/\"},\"headline\":\"Belarus plans to connect third nuclear plant unit to grid in 2035-38\",\"datePublished\":\"2025-12-22T12:27:36+00:00\",\"dateModified\":\"2026-03-09T20:10:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/pozirk.online\/en\/news\/169281\/\"},\"wordCount\":191,\"publisher\":{\"@id\":\"https:\/\/pozirk.online\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/pozirk.online\/en\/news\/169281\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pozirk.online\/wp-content\/uploads\/2024\/01\/pozirk_color_blank_1128x752.jpg\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pozirk.online\/en\/news\/169281\/\",\"url\":\"https:\/\/pozirk.online\/en\/news\/169281\/\",\"name\":\"Belarus plans to connect third nuclear plant unit to grid in 2035-38 | Pozirk\",\"isPartOf\":{\"@id\":\"https:\/\/pozirk.online\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/pozirk.online\/en\/news\/169281\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/pozirk.online\/en\/news\/169281\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pozirk.online\/wp-content\/uploads\/2024\/01\/pozirk_color_blank_1128x752.jpg\",\"datePublished\":\"2025-12-22T12:27:36+00:00\",\"dateModified\":\"2026-03-09T20:10:49+00:00\",\"description\":\"December 22,&nbsp;Pozirk. Belarus plans to build a third unit at the nuclear power plant in Astraviec and connect it to the greed between 2035 and 2038,\",\"breadcrumb\":{\"@id\":\"https:\/\/pozirk.online\/en\/news\/169281\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pozirk.online\/en\/news\/169281\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pozirk.online\/en\/news\/169281\/#primaryimage\",\"url\":\"https:\/\/pozirk.online\/wp-content\/uploads\/2024\/01\/pozirk_color_blank_1128x752.jpg\",\"contentUrl\":\"https:\/\/pozirk.online\/wp-content\/uploads\/2024\/01\/pozirk_color_blank_1128x752.jpg\",\"width\":1128,\"height\":752},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pozirk.online\/en\/news\/169281\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/pozirk.online\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Belarus plans to connect third nuclear plant unit to grid in 2035-38\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pozirk.online\/en\/#website\",\"url\":\"https:\/\/pozirk.online\/en\/\",\"name\":\"Pozirk\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/pozirk.online\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pozirk.online\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/pozirk.online\/en\/#organization\",\"name\":\"Pozirk\",\"url\":\"https:\/\/pozirk.online\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pozirk.online\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/pozirk.online\/wp-content\/uploads\/2023\/11\/cropped-Logo_color_512.png\",\"contentUrl\":\"https:\/\/pozirk.online\/wp-content\/uploads\/2023\/11\/cropped-Logo_color_512.png\",\"width\":512,\"height\":512,\"caption\":\"Pozirk\"},\"image\":{\"@id\":\"https:\/\/pozirk.online\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/pozirkonline\/\",\"https:\/\/x.com\/Pozirk_online\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Belarus plans to connect third nuclear plant unit to grid in 2035-38 | Pozirk","description":"December 22,&nbsp;Pozirk. Belarus plans to build a third unit at the nuclear power plant in Astraviec and connect it to the greed between 2035 and 2038,","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pozirk.online\/en\/news\/169281\/","og_locale":"en_US","og_type":"article","og_title":"Belarus plans to connect third nuclear plant unit to grid in 2035-38 | Pozirk","og_description":"December 22,&nbsp;Pozirk. Belarus plans to build a third unit at the nuclear power plant in Astraviec and connect it to the greed between 2035 and 2038,","og_url":"https:\/\/pozirk.online\/en\/news\/169281\/","og_site_name":"Pozirk","article_publisher":"https:\/\/www.facebook.com\/pozirkonline\/","article_modified_time":"2026-03-09T20:10:49+00:00","og_image":[{"width":1128,"height":752,"url":"https:\/\/pozirk.online\/wp-content\/uploads\/2024\/01\/pozirk_color_blank_1128x752.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@Pozirk_online","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/pozirk.online\/en\/news\/169281\/#article","isPartOf":{"@id":"https:\/\/pozirk.online\/en\/news\/169281\/"},"headline":"Belarus plans to connect third nuclear plant unit to grid in 2035-38","datePublished":"2025-12-22T12:27:36+00:00","dateModified":"2026-03-09T20:10:49+00:00","mainEntityOfPage":{"@id":"https:\/\/pozirk.online\/en\/news\/169281\/"},"wordCount":191,"publisher":{"@id":"https:\/\/pozirk.online\/en\/#organization"},"image":{"@id":"https:\/\/pozirk.online\/en\/news\/169281\/#primaryimage"},"thumbnailUrl":"https:\/\/pozirk.online\/wp-content\/uploads\/2024\/01\/pozirk_color_blank_1128x752.jpg","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/pozirk.online\/en\/news\/169281\/","url":"https:\/\/pozirk.online\/en\/news\/169281\/","name":"Belarus plans to connect third nuclear plant unit to grid in 2035-38 | Pozirk","isPartOf":{"@id":"https:\/\/pozirk.online\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pozirk.online\/en\/news\/169281\/#primaryimage"},"image":{"@id":"https:\/\/pozirk.online\/en\/news\/169281\/#primaryimage"},"thumbnailUrl":"https:\/\/pozirk.online\/wp-content\/uploads\/2024\/01\/pozirk_color_blank_1128x752.jpg","datePublished":"2025-12-22T12:27:36+00:00","dateModified":"2026-03-09T20:10:49+00:00","description":"December 22,&nbsp;Pozirk. Belarus plans to build a third unit at the nuclear power plant in Astraviec and connect it to the greed between 2035 and 2038,","breadcrumb":{"@id":"https:\/\/pozirk.online\/en\/news\/169281\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pozirk.online\/en\/news\/169281\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pozirk.online\/en\/news\/169281\/#primaryimage","url":"https:\/\/pozirk.online\/wp-content\/uploads\/2024\/01\/pozirk_color_blank_1128x752.jpg","contentUrl":"https:\/\/pozirk.online\/wp-content\/uploads\/2024\/01\/pozirk_color_blank_1128x752.jpg","width":1128,"height":752},{"@type":"BreadcrumbList","@id":"https:\/\/pozirk.online\/en\/news\/169281\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/pozirk.online\/en\/"},{"@type":"ListItem","position":2,"name":"Belarus plans to connect third nuclear plant unit to grid in 2035-38"}]},{"@type":"WebSite","@id":"https:\/\/pozirk.online\/en\/#website","url":"https:\/\/pozirk.online\/en\/","name":"Pozirk","description":"","publisher":{"@id":"https:\/\/pozirk.online\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pozirk.online\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/pozirk.online\/en\/#organization","name":"Pozirk","url":"https:\/\/pozirk.online\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pozirk.online\/en\/#\/schema\/logo\/image\/","url":"https:\/\/pozirk.online\/wp-content\/uploads\/2023\/11\/cropped-Logo_color_512.png","contentUrl":"https:\/\/pozirk.online\/wp-content\/uploads\/2023\/11\/cropped-Logo_color_512.png","width":512,"height":512,"caption":"Pozirk"},"image":{"@id":"https:\/\/pozirk.online\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/pozirkonline\/","https:\/\/x.com\/Pozirk_online"]}]}},"_links":{"self":[{"href":"https:\/\/pozirk.online\/en\/wp-json\/wp\/v2\/articles\/169281","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pozirk.online\/en\/wp-json\/wp\/v2\/articles"}],"about":[{"href":"https:\/\/pozirk.online\/en\/wp-json\/wp\/v2\/types\/articles"}],"author":[{"embeddable":true,"href":"https:\/\/pozirk.online\/en\/wp-json\/wp\/v2\/users\/83"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pozirk.online\/en\/wp-json\/wp\/v2\/media\/63993"}],"wp:attachment":[{"href":"https:\/\/pozirk.online\/en\/wp-json\/wp\/v2\/media?parent=169281"}],"wp:term":[{"taxonomy":"rubric","embeddable":true,"href":"https:\/\/pozirk.online\/en\/wp-json\/wp\/v2\/rubric?post=169281"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}